Friday, May 25, 2012

UPDATE 25 May 2012 from Leslie Grey, FAA

Good Morning,

In keeping with our recent practice, I’m sending you this monthly update for the Kodiak Airport EIS.  We skipped April because we had face-to-face meetings with some agencies.  I much prefer those in-person conversations, but since we don’t have the time and budget to meet very often I’ll get back on schedule with our regular update.

As you are aware, it is typical although not required for federal agencies to identify a preferred alternative in draft NEPA analyses, for both environmental assessments and environmental impact statements.  There are many reasons why identification of a preferred alternative can be helpful, to the agencies and public, but for projects involving complicated alternatives or sensitive environmental resources the preference isn’t always easy to determine.  That is the case for proposed runway safety area improvements at Kodiak Airport. FAA and our consulting team needed to work through many challenging issues, including constraints on aviation operations at Kodiak.  Further, we realized (with help from many of you) that the environmental analysis for some resources needed to be more rigorous.

I’m pleased to report that we are now in a position to identify what FAA intends to include in the Draft EIS as preferred alternatives for runway safety area improvements to Runways 07/25 and 18/36.  They are:

·        Runway 07/25 - Alternative 2. This alternative would improve runway safety area on the primary, east-west runway by placing fill into marine waters east of Runway end 25.  A 600-foot long RSA would be constructed that includes an EMAS (engineered materials arresting system) bed measuring 340 feet long by 170 feet.  The EMAS would provide a 70-knot stopping capability for the B737-400, design aircraft.

·        Runway 18/36 – Alternative 7.  This alternative would improve runway safety areas on both ends of the north-south Runway 18/36.  At the north, Runway end 18, no additional disturbance would occur beyond the current airport boundary but an EMAS bed measuring about 155 feet long by 170 feet wide, offering a 40-knot stopping capability for the B737-400 would be installed on the existing pavement.  At the south, Runway end 36 the runway would be shifted about 240 feet further south, and a 360-foot RSA would be constructed for a combined 600 linear feet of new fill beyond the existing runway threshold.
The preferred alternatives and other build alternatives that will be evaluated in the Draft EIS are shown in the figure Kodiak RSA Alternatives Comparison on the EIS web site at http://www.kodiakairporteis.com/documents/Kodiak%20RSA%20Alternatives%20Comparison.pdf
Now that we have preferred alternatives we can move forward with some final work necessary to the environmental evaluations and compliance with other state and federal laws.  For example, we recently met with USFWS and NOAA Fisheries to re-initiate consultation required by the Endangered Species Act.  FAA will be submitting draft biological assessments to both of these agencies concurrent with publication of the Draft EIS.  Similarly, concurrent with the Draft EIS ADOT&PF will be submitting to the U.S. Coast Guard and USFWS an application for an ANILCA Title X permit.  The Draft EIS will serve as the requisite NEPA documentation supporting their application.
We still have much other work to be completed, including further consultation and coordination with many of you, but I fully expect the Draft EIS will be released to the public later this summer.  As I mentioned in the last project update, FAA will provide 60 days for everyone to review the Draft EIS and submit comments, and at least one public hearing will be held in Kodiak during the review period.
I will keep you informed as we get closer to release of the Draft EIS.  In the meantime, let me know if you have questions, comments or concerns.   My phone number is 271-5453 or you can email Leslie.Grey@faa.gov.  

Best regards, Leslie

Leslie A. Grey
Environmental Protection Specialist
FAA - Alaskan Region, Airports Division
907-271-5453

Wednesday, January 18, 2012

UPDATE 18 January 2012

Hello,
We have completed the Alaska Rare Plant Species Survey Report in support of
the analysis being done for the Kodiak Airport Environmental Impact
Statement.  This work adds to previous findings concerning the presence of
sensitive plant species in the Buskin River drainage just north of the
airport.  The report documents the results of the plant surveys conducted
by FAA's consultants last August, not only in the Buskin River estuary, but
also in estuarine habitats of drainages entering Women's Bay.
 
The report has been posted on the project website at
http://www.kodiakairporteis.com/documents/documents.htm.  If you have any
questions about the report or other aspects of the EIS, please don’t
hesitate to e-mail or call me at 271-5453.  Leslie
 
Leslie A. Grey
Environmental Protection Specialist
FAA - Alaskan Region, Airports Division
907-271-5453

Monday, March 14, 2011

FAA update 03 March 2011 Leslie Grey reaction to Kodiak meetings

I want to thank those of you who were able to participate in our recent
meetings concerning the Environmental Impact Statement (EIS) for Kodiak
Airport.  As we mentioned in our discussions of runway safety area (RSA)
alternatives, FAA has put a lot of time and effort into exploring methods
for improving RSAs on two of the runways.  I hope everyone who attended the
meetings would agree that there are significant limitations on what can be
done to improve RSAs without adversely affecting Airport operations and
service.  Nevertheless, we heard some great questions and comments that
further emphasize the need for FAA to confirm our preliminary conclusions
and validate any assumptions used in developing a range of EIS
alternatives.
 
The comments, questions and criticisms generated at these meetings are not
only helpful, but always presented in a constructive manner, and I
personally appreciate the honest feedback.  As I promised during the
meetings, we will work hard to address all of the issues you raised. In the
coming months, I expect to send you periodic project updates that will
provide responses to the more substantive questions and concerns.
 
Please don’t hesitate to call or write if you have questions about the
project.  And, as always, please let me know if you should no longer be on
our e-mail distribution list, or if your contact information has changed.
If there are others in your organization who should receive these updates
and other information concerning the Kodiak Airport EIS, please forward
this message.  Thanks!  Leslie
 
Leslie A. Grey
Environmental Protection Specialist
FAA - Alaskan Region, Airports Division
907-271-5453

FAA update 08 Feb 2011 from Leslie Grey

I would like to update you on the status and progress of the Kodiak Airport Environmental Impact Statement (EIS) currently underway.  The Federal Aviation Administration is preparing this EIS to evaluate actions proposed by the Airport Operator, the Alaska State Department of Transportation and Public Facilities (ADOT&PF), to improve the Runway Safety Area (RSA).

For those of you that may be unfamiliar, the RSA is a clear and graded area surrounding a runway.  This area is there to minimize the severity of injury and aircraft damage in the event of an aircraft excursion.  The project in Kodiak is to improve the deficient RSA to the extent practical.

First, I would like to thank you for your patience and continued interest throughout the course of this project.  There has been a tremendous amount of work and progress since my last update in September 2010.  Since that last message, we have evaluated and updated a range of build alternatives that support operational needs, are reasonable, and are financially feasible.

We are currently in the process of scheduling meetings in both Kodiak and Anchorage with staff from cooperating agencies, coordinating agencies, and federally recognized tribal governments.  These meetings are a necessary part of the EIS process, and will assist us greatly in completing the Draft EIS in anticipation of a mid-summer 2010 release.

Our extended review comments and concerns generated from the preliminary draft EIS, as well as our development of updated build alternatives has impacted our schedule.  Despite that impact, we still plan to release the Draft EIS as close to the above schedule of mid-summer 2010 as possible.  As that date approaches, I will continue to provide updates letting you know were we are.  If you have any questions or comments, please feel free to contact me at the number or e-mail address below.

Finally, if you no longer want updates, please let me know, and I will remove you from our mailing list.  Additionally, if you know of someone that needs to be included, but is not, please forward this message, and have them contact me for inclusion in future updates.

Thank you so much, Leslie

Leslie A. Grey
Environmental Protection Specialist
FAA - Alaskan Region, Airports Division
907-271-5453

Monday, September 13, 2010

FAA UPDATE: 13 September 2010


Leslie.Grey@faa.gov
Subject: Kodiak Airport EIS project update                

All,
This message is to inform agencies and other interested parties of
the status of the Environmental Impact Statement (EIS) being prepared by
the Federal Aviation Administration (FAA).  I think you are all aware
the purpose of the EIS is to evaluate actions proposed by the Airport
operator, Alaska Department of Transportation and Public Facilities
(ADOT&PF) to bring the facility into compliance with the most current
national aviation safety standards for runway safety areas.


First, I would like to thank many of you for attending our various
Anchorage and Kodiak meetings in late June.  My consulting team and I found
them very informative, particularly as we were able to further explore
comments from agencies concerning the Preliminary Draft EIS (PDEIS), and
discuss some of our proposed changes to the document in response to your
concerns.


As I informed meeting participants earlier this summer, our efforts to
complete the Draft EIS (DEIS) are focused in two areas.  At this time, FAA
is conducting a comprehensive review of the alternatives to affirm that the
EIS includes a suitable range of practicable and feasible runway safety
area enhancements for the runways in consideration.  I can tell you the
Draft EIS will include some different alternatives than were evaluated in
the PDEIS.  Second, we are thoroughly reviewing and, in some cases,
revising our impact analyses not only to consider the new alternatives but
to address substantive comments made by those of you who reviewed the
PDEIS.  We are also working on all other aspects of the EIS to respond to
comments and assure an appropriate level of disclosure when the DEIS is
released for public review.


I plan to schedule another round of meetings in the near future with as
many of you as possible.  Our intent will be to present you with a detailed
explanation of the alternatives, including the physical and operational
factors that limit or even prevent consideration of some options and other
rationale used to screen impracticable alternatives or those not feasible.
We will spend time reviewing the alternatives that are undergoing a full
environmental analysis, and I hope to be able at that time to present you
with FAA's preferred alternatives.


The current schedule for the project has the Draft EIS being released
during the first half of 2011.  As we get closer to completion of the
analysis and documentation, I will provide additional updates to inform you
of our progress and next steps.

Let me know if you have questions or concerns, at the contact information
below.  Additionally, the project website (kodiakairporteis.com) has
background information about the project.


P.S.  Please let me know if you should no longer be on our e-mail
distribution list, or if your contact information has changed. In addition,
if there are others in your organization who should receive these updates
and other information concerning the Kodiak Airport EIS, please forward
this message.  Thanks, Leslie


Leslie A. Grey
Environmental Protection Specialist
FAA - Alaskan Region, Airports Division
907-271-5453

Sunday, September 12, 2010

Rare Plant in Path of Runway Extension Toward Buskin River

Below the photo is a correct version of the story that appeared in the Kodiak Daily Mirror on September 8 2010.


Article published on Wednesday, Sep 08th, 2010
By SAM FRIEDMAN
Mirror Writer
A rare plant that had been documented only three times before in the world is suddenly making appearances in two different parts of Kodiak.
It’s called sessileleaf scurvygrass and it does not look like much. It’s a short plant between 2 and 3 inches tall with small white flowers and big green seedpods.
What is special about it at first glance is that it lives in an unusual place for a type of plant that usually grows on land. It seems to thrive below the tide line in lagoons, where it is completely submersed in brackish water twice a day.
The plant’s name comes from its relation to the common scurvy grass, a vitamin C-rich plant once eaten by sailors to treat and prevent scurvy. It is a member of the cabbage family.
Previously the plant had only been observed two times on the Kodiak Archipelago and once on the Kenai Peninsula. The first time it was identified by scientists was in the 1930s.
But this year Kodiak botanist Stacy Studebaker came across it three times in one summer. First on Sitkalidak Island and then close to Kodiak near the mouth of the Buskin River.
“Nobody knows much about it,” she said. “That’s what is so exciting about it. How does it disperse its seeds? How does it get pollinated when it is under water half the time? Is it an annual or a perennial? Nobody knows.”
Studebaker discovered the sessileleaf scurvygrass populations on Sitkalidak Island as part of her annual plant survey of a part of the Kodiak National Wildlife Refuge. She first found it in McCord Bay and then found it in similar habitat in Sitkalida Lagoon
The discovery on the Buskin River came by accident when she described the plant to refuge biologist Bill Pyle, who said the plant sounded like something he had seen before at the Buskin.
An investigation of the Buskin revealed a large population not far from the mouth of the river.
The search also found two other rare plants, the Alaska mist maiden and the popcorn flower, neither as rare as the scurvy grass. Both have white flowers, although the popcorn flower has long skinny leaves while the Alaska mist maiden has large, scalloped leaves.
Studebaker said the presence of rare plants made her want to get more involved in a local conservation issue she was already watching closely, the planned expansion of the Kodiak State Airport runway.
The project is part of a required safety expansion to add buffer zones around airport runways. For the north-south runway the Federal Aviation Administration (FAA) is considering an alternative that would extend the land around the end of the runway by 1,200 feet toward the mouth of the Buskin.
Studebaker favors an alternative that would expand the runway toward the Coast Guard Base to the south. An expansion of the runway to the north would be devastating to the newly discovered plants, she said.
“They (the FAA) have this whole team of biologists and scientist who supposedly looked at this area,” she said. “They didn’t find the rare plants. That makes me wonder what else they might have missed.”
Studebaker wrote the FAA to tell the agency about the plant after her new discovery.
She has long been skeptical that an expansion toward the Buskin could be done without harming the river’s salmon run.
The FAA has been working on its environmental impact statement for the project since 2007. It recently announced it is going to push back its public release of a draft environmental impact study from fall 2010 to some time in the first half of 2011.
The sessileleaf scurvygrass is not considered an endangered species because so little is known about it. But it is in the category of rarest plants on the Alaska Natural Heritage Program rare vascular plant tracking list.
Mirror writer Sam Friedman can be reached via e-mail at sfriedman@kodiakdailymirror.com

Sunday, January 3, 2010

Introduction to the FAA Kodiak Runway Extension Proposals


The red line on the photo shows the original plan that the FAA was proposing. They wanted to fill in the area within the line to extend the entire land mass surrounding the runways out 1000 feet beyond where the shore is presently. The red and yellow blocks represent the FAA's current alternatives.   


Stewards of the Buskin River State Recreation Site

The purpose of this group is to oppose any plans by the FAA (Federal Aviation Administration) to extend the north-south runway #18/36 at the Kodiak Airport toward the Buskin River. This is a proactive effort to get the facts out about this issue to interested people before this proposal is a done deal. At this point, your action can shape the future of the Buskin River State Recreation Site. If you are willing to help, read on.

For the last 3 years, the FAA has been preparing an EIS (Environmental Impact Statement) for a proposal to expand the Runway Safety Areas on the runways at the Kodiak Airport. The FAA believes that by doing this, it will lesson the potential for aircraft damage.

Currently, a PDEIS (Preliminary Draft Environmental Impact Statement) is circulating among a select group of agencies and organizations that have direct regulatory jurisdiction over the area and its resources. (USFWS, ADF&G, Alaska State Parks, Tribal groups, USCG) A few scoping meetings were held to gather input from these agencies and a select group of organizations but no meetings have been held for the general public to review the plans and various alternatives. No opportunities for the general public will be scheduled to review or comment on the plans until the DEIS (Draft Environmental Impact Statement) is completed sometime early in 2010.

Although Preferred Alternatives have not been identified yet, the FAA is seriously considering Alternative #3, to extend the landmass of runway #18/36 (the north-south runway) 1,200 feet toward the mouth of the Buskin River from the present end of the runway parallel to the existing beach between the river and the ocean.  (see attached photo)

In addition, the FAA is considering extending the landmass of runway #07/25 (the east-west runway) 800 feet straight out into Chiniak Bay from the existing end of runway.

The potential for impacts on the environment, fish and wildlife, recreation, and subsistence by Alternative #3 make the proposed action impracticable and unacceptable, especially when there is a viable alternative. Alternative #4 would extend the landmass of the north-south runway southward instead of northward and would have far fewer impacts.

Because of its close proximity to town, the Buskin River is used more for sport and subsistence fishing than any other river on the road system. 

Here are some of the potential impacts of Alternative #3 on the Buskin River area.

  • Placing fill in marine waters would result in direct habitat loss for marine birds. Chiniak Bay was designated as an Important Bird Area of Global Significance in 2008 by Birdlife International and the National Audubon Society for habitat of three bird species of conservation concern; Black oystercatcher, Steller’s Eider, and Emperor Goose.

  • Placing fill in marine waters would have adverse impacts on pink, chum, red, and coho salmon.

  • Placing fill in this area would have direct effects on natural physical processes that dictate stream flow and hydrodynamics that shape aquatic habitats and species that live there.

  • Placing fill in this area will directly impact the view shed of the ocean from Buskin River. With the 1,200 foot landmass extension that will be approximately 30 feet high, from the existing north end of runway #18/36, most of the present ocean view from the Buskin River beach and parking lot will be obstructed and only a small view of the ocean will remain toward town.

  • Placing fill in this area will reduce access to beach areas at the mouth of the Buskin River for sport and subsistence fishing, environmental education, birding, beach combing, walking.


Here’s what you can do:

Promote Alternative #4 for Runway 18/36 to extend the N-S runway to the south instead of to the north toward the mouth of the Buskin River.

Stay informed. Read the information on the FAA’s website: http://www.kodiakairporteis.com/ 

Watch for announcements of meetings and attend meetings to get the facts.

Write to the FAA: Leslie Grey: Leslie.Grey@faa.gov or comments@kodiakairporteis.com 

Write letters to the editor of the Kodiak Daily Mirror

Get others involved by spreading the information.