Good Morning,
In keeping with our recent practice,
I’m sending you this monthly update for the Kodiak Airport EIS. We
skipped April because we had face-to-face meetings with some agencies.
I much prefer those in-person conversations, but since we don’t
have the time and budget to meet very often I’ll get back on schedule
with our regular update.
As you are aware, it is typical although
not required for federal agencies to identify a preferred alternative in
draft NEPA analyses, for both environmental assessments and environmental
impact statements. There are many reasons why identification of a
preferred alternative can be helpful, to the agencies and public, but for
projects involving complicated alternatives or sensitive environmental
resources the preference isn’t always easy to determine. That is
the case for proposed runway safety area improvements at Kodiak Airport.
FAA and our consulting team needed to work through many challenging issues,
including constraints on aviation operations at Kodiak. Further,
we realized (with help from many of you) that the environmental analysis
for some resources needed to be more rigorous.
I’m pleased to report that we are now
in a position to identify what FAA intends to include in the Draft EIS
as preferred alternatives for runway safety area improvements to Runways
07/25 and 18/36. They are:
· Runway
07/25 - Alternative 2. This alternative would improve runway
safety area on the primary, east-west runway by placing fill into marine
waters east of Runway end 25. A 600-foot long RSA would be constructed
that includes an EMAS (engineered materials arresting system) bed measuring
340 feet long by 170 feet. The EMAS would provide a 70-knot stopping
capability for the B737-400, design aircraft.
· Runway
18/36 – Alternative 7. This alternative would improve runway
safety areas on both ends of the north-south Runway 18/36. At the
north, Runway end 18, no additional disturbance would occur beyond the
current airport boundary but an EMAS bed measuring about 155 feet long
by 170 feet wide, offering a 40-knot stopping capability for the B737-400
would be installed on the existing pavement. At the south, Runway
end 36 the runway would be shifted about 240 feet further south, and a
360-foot RSA would be constructed for a combined 600 linear feet of new
fill beyond the existing runway threshold.
The preferred alternatives and other
build alternatives that will be evaluated in the Draft EIS are shown in
the figure Kodiak RSA Alternatives Comparison on the EIS web site
at http://www.kodiakairporteis.com/documents/Kodiak%20RSA%20Alternatives%20Comparison.pdf
Now that we have preferred alternatives
we can move forward with some final work necessary to the environmental
evaluations and compliance with other state and federal laws. For
example, we recently met with USFWS and NOAA Fisheries to re-initiate consultation
required by the Endangered Species Act. FAA will be submitting draft
biological assessments to both of these agencies concurrent with publication
of the Draft EIS. Similarly, concurrent with the Draft EIS ADOT&PF
will be submitting to the U.S. Coast Guard and USFWS an application for
an ANILCA Title X permit. The Draft EIS will serve as the requisite
NEPA documentation supporting their application.
We still have much other work to be completed,
including further consultation and coordination with many of you, but I
fully expect the Draft EIS will be released to the public later this summer.
As I mentioned in the last project update, FAA will provide 60 days
for everyone to review the Draft EIS and submit comments, and at least
one public hearing will be held in Kodiak during the review period.
I will keep you informed as we get closer
to release of the Draft EIS. In the meantime, let me know if you
have questions, comments or concerns. My phone number is 271-5453
or you can email Leslie.Grey@faa.gov.
Best regards, Leslie
Leslie A. Grey
Environmental Protection Specialist
FAA - Alaskan Region, Airports Division
907-271-5453
Showing posts with label runway extension. Show all posts
Showing posts with label runway extension. Show all posts
Friday, May 25, 2012
Saturday, October 1, 2011
UPDATE: 30 September 2011 from Leslie Grey FAA
Good morning, I just wanted to give you a quick heads-up concerning progress on the Kodiak Airport EIS. FAA has completed our examination of the factors that may constrain or influence runway safety area design for the north-south (18/36) and east-west (07/25) runways at the airport. We’ll provide much more detail in the near future on how we conducted this review and analysis, but for now I’ll note that factors considered included: 1) operational requirements such as aircraft use and approach and departure procedures, 2) landing aids such as the Runway 36 VASI and the Runway 25 glide slope, 3) runway utilization patterns, 4) federal safety requirements for the design aircraft, and 5) opportunities to avoid or minimize environmental impacts. As a result of this effort, we’ve established a range of alternatives that will be subject to a full examination of environmental impacts in the EIS. Our consultants are at this time preparing materials that will depict the details of these new alternatives (and I emphasize “new,” because most of them were not included in the Preliminary Draft EIS). My plan is to schedule meetings with all of you sometime in November, in Kodiak and Anchorage, to present these new alternatives and explain the work behind our decisions. Due to continuing uncertainty over the 2012 budget for FAA’s Airports Program, unfortunately I can’t yet confirm that meetings will take place, let alone times and dates. But I hope to get approval sometime in the next week or so, and will then notify you all of the relevant details. In the meantime, please don’t hesitate to call (271-5453) or write (Leslie.Grey@faa.gov) if you have questions or comments or just want to talk about the EIS. Thanks very much, Leslie A. Grey Environmental Protection Specialist FAA - Alaskan Region, Airports Division 907-271-5453
Thursday, July 21, 2011
20 July 2011: Update from Leslie Grey, FAA
Hello, It’s been some time since I’ve provided all of you with information concerning the Kodiak Airport EIS. This message will give you a sense of the work we’ve been doing since our meetings in Anchorage and Kodiak last February. I’ll also take the opportunity to let you know of a new approach I’ve implemented to keep the public, tribes, agencies and other stakeholders informed of our efforts. First though, a summary of what is happening with the EIS. Most of our effort right now is being consumed by a comprehensive examination of possible alternatives. Last February I organized meetings with tribal and agency representatives during which we held some of the very good discussion concerning operational factors that can control or constrain what could be done with runways at Kodiak Airport. For example, a common question asked was whether the north-south Runway 18/36 could be shifted to the south, so that runway safety area could be installed on the south runway end without adding new land that would affect the Buskin River. We are conducting a rigorous evaluation of the aviation requirements for that runway to determine what, if any, degree of runway shift would be possible without bringing obstructions such as trees or terrain into the glide slopes for approaching aircraft. Other factors also have to be considered, such as impacts to critical navigational aids. So that all possible combinations of alternatives are being considered, a similar analysis is being conducted for the east-west Runway 7/25. We are also considering other questions and options raised during those meetings involving engineered materials arresting systems, side slope angles and other construction requirements. All of this analysis and re-examination of alternatives is taking more time than any of us working on the EIS would have liked, but I’m satisfied that the results will stand up to the very close scrutiny needed for such important decisions. In the meantime, I want to remind you that ADOT&PF is still planning to initiate construction work this summer on a project unrelated to the EIS or safety areas. A contractor has been hired to re-pave Runway 18/36, and at the same time replace lighting within and along that runway. Although much of the work will be on the surface, with little new disturbance, there will have to be some excavation along runway shoulders and for utility crossings. Once ADOT&PF establishes a work schedule we will make sure to pass that and other relevant information along. After the February meetings I promised to start sending periodic project updates, not only to keep you better informed of our work and progress, but also to provide responses to the more substantive questions and concerns. I’m sorry for the delay in getting that started – and I won’t bore you with details of the contracting issues we had to resolve or other seemingly minor bureaucratic issues to sort through – but this message serves notice that in the coming weeks and months, the updates will be regular and informative, even if the answers aren’t always what you would prefer to hear. I plan on using these communications to address a variety of topics, but particularly the areas that seem to generate the most interest among agency and tribal representatives, and the public. These updates will not always come directly from me. Certain senior members of my EIS consulting team, depending on their particular expertise and experience, will also be responsible for putting together the updates. I hope you will feel comfortable calling them directly or sending a reply e-mail if you have questions or concerns. Of course, please call or write me at any time, and if I can’t immediately provide the information you need I’ll make sure we get it to you as soon as possible. Thanks very much for your patience. On behalf of FAA, I truly appreciate your continued interest in the work we are doing and the necessary processes we must follow to reach a decision concerning proposed runway safety area improvements at Kodiak Airport. Leslie Grey Environmental Protection Specialist FAA - Alaskan Region, Airports Division 907-271-5453
http://kodiakairporteis.com/
Subscribe to:
Posts (Atom)