Hello All,
I know all of you are familiar with
the Kodiak Airport environmental impact statement (EIS): Why we are
engaged in that process, how we’ve developed alternatives, and the many
environmental and cultural concerns associated with some of the options
to improve runway safety areas (RSAs). I’d like to use this Project
Update to introduce you to another process evaluation we are conducting
concurrent with the EIS to comply with the Alaska National Interest Lands
Conservation Act, or ANILCA.
What is ANILCA?
When Congress passed ANILCA as Public
Law 96-487 in 1980, more than 100 million acres of federal lands in Alaska
were converted into “conservation system units”. Conservation system
units are public lands in Alaska that have been given special designations
because of their natural or cultural resources, or other attributes. Wilderness
areas and national monuments in Alaska are conservation system units, as
are national wildlife refuges. Congress recognized that Alaskans,
particularly those living in remote areas, depend on utilities and means
of transportation that must often extend across great distances. Air travel
is often the only option. To meet the transportation needs unique to Alaska,
including socioeconomic and public safety needs, Congress included some
exceptions in ANILCA that establish a decision-making process to allow
Alaskans to develop transportation and utility systems in conservation
system units.
What exception in ANILCA may be
relevant to the Kodiak Airport?
One portion of ANILCA, commonly referred
to by its place in the law, “Title XI,” addresses whether and how transportation
and utility systems can access and cross so-called “conservation system
units.” The submerged lands around the Kodiak Airport are within
a conservation system unit, the Alaska Maritime National Wildlife Refuge.
The Alaska Maritime National Wildlife Refuge, encompassing much of the
Aleutian Chain and more than 2,500 islands, cliffs, headlands and other
lands and marine waters from the Chukchi Sea to Southeastern Alaska, qualifies
under ANILCA as a conservation system unit. In fact, the Maritime
Refuge was established by ANILCA when 11 existing refuges were combined
with other lands and waters to form the largest unit within the National
Wildlife Refuge system.
Does ANILCA Title XI Apply to the
Kodiak RSA Improvement Projects?
Yes, Title XI of ANILCA applies to the
proposed RSA improvements, and here’s why. First, the runway safety
areas are considered parts of a transportation system, in this case the
Kodiak Airport that provides access for people and freight to and from
Kodiak Island. Second, the RSA improvements would cross into a conservation
system unit, as the submerged lands offshore from the Airport in Chiniak
Bay are within the boundaries of the Maritime Refuge.
So ANILCA Title XI Applies to the
RSA Improvement Projects - What’s the Catch?
Really, there is no catch, but it does
add another layer of review and different approvals for the RSA projects
to be constructed and used. The applicant (ADOT&PF) must submit a transportation
and utility systems application to federal agencies with jurisdiction (i.e.
permitting authority), where without the permit, the transportation and
utility systems cannot be established or operated. I guess there
is a twist, though. Normally, for the Maritime Refuge, the U.S. Fish and
Wildlife Service would be that agency with primary jurisdiction. However,
the portions of the Maritime Refuge immediately offshore from the Airport
were withdrawn for defense purposes, in various installments through Executive
Orders and Public Law Orders, starting about 1940. I’ll save the
details of those actions for the EIS, but the end result is that the U.S.
Coast Guard also has jurisdiction over the Refuge lands that would be accessed
by the RSA improvements and would also have to decide whether to approve
or deny a right of way permit. The U.S. Fish and Wildlife Service
still have an important role to play, however, since they have management
responsibility for lands within the Refuge and also resources within the
Refuge (including some marine mammals, migratory birds, and threatened
or endangered species). In addition, the FAA, as lead agency of the EIS
and the agency that would fund the RSA improvements, also would be involved
in the Title XI decision-making process. All federal permitting agencies
will be required to review the application for completeness, develop a
decision on the application with detailed findings, and if appropriate,
identify appropriate conservation measures to protect those resources.
What are the Steps to Conform
with ANILCA Title XI?
For the RSA improvement projects to
be allowed in the Maritime Refuge, a number of findings and statements
must be made by the agencies tasked with decision-making responsibilities.
For example, they must find there is no economically feasible or
prudent alternative to routing the transportation system into the Refuge,
and if there is not, whether there are other routes that would result in
fewer or less severe impacts to the Refuge. The agencies must also
make detailed findings concerning the short and long term social, economic
and environmental impacts of national, State or local significance, including
impacts on fish and wildlife and their habitat and on rural, traditional
lifestyles. If these and other findings sound familiar they should, because
all are consistent with the types of analysis and conclusions that must
be included within an environmental impact statement.
Therefore, concurrent with the Kodiak
Airport Draft EIS, Alaska DOT&PF will be submitting an application
to the Coast Guard, USFWS, USACOE and FAA under ANILCA Title XI. Supporting
documentation for the application will consist of the Draft EIS, prepared
by FAA and addressing all of the information needed by the agencies with
permitting authority to evaluate the application and develop the necessary
findings and statements.
Summary and Schedule
For some time FAA has been preparing
an environmental impact statement considering impacts associated with runway
safety area improvements at Kodiak Airport. Our analysis of possible
impacts caused by the proposed RSA improvements is almost complete, and
I hope to publish for agency and public review a Draft EIS, including the
ANILCA Title XI application and preliminary analysis, sometime later this
summer. The FAA will be providing the public, agencies, and tribes
and other interested parties 60 days to review the DEIS. The FAA,
Coast Guard, USACOE and USFWS will review the Title XI application, and
inform ADOT&PF in writing whether it contains the information required
for evaluation under ANILCA (ANILCA § 1104 (d)). During our EIS public
comment period, we will also hold public hearings concerning the ANILCA
application in both Alaska and Washington DC.
I hope this introduction to ANILCA Title
XI has been informative. Please don’t hesitate to send an e-mail
(leslie.grey@faa.gov)
or call me at 907-271-5453. Best regards, Leslie
Leslie A. Grey
Environmental Protection Specialist
FAA - Alaskan Region, Airports Division
907-271-5453
Monday, July 2, 2012
Friday, May 25, 2012
UPDATE 25 May 2012 from Leslie Grey, FAA
Good Morning,
In keeping with our recent practice, I’m sending you this monthly update for the Kodiak Airport EIS. We skipped April because we had face-to-face meetings with some agencies. I much prefer those in-person conversations, but since we don’t have the time and budget to meet very often I’ll get back on schedule with our regular update.
As you are aware, it is typical although not required for federal agencies to identify a preferred alternative in draft NEPA analyses, for both environmental assessments and environmental impact statements. There are many reasons why identification of a preferred alternative can be helpful, to the agencies and public, but for projects involving complicated alternatives or sensitive environmental resources the preference isn’t always easy to determine. That is the case for proposed runway safety area improvements at Kodiak Airport. FAA and our consulting team needed to work through many challenging issues, including constraints on aviation operations at Kodiak. Further, we realized (with help from many of you) that the environmental analysis for some resources needed to be more rigorous.
I’m pleased to report that we are now in a position to identify what FAA intends to include in the Draft EIS as preferred alternatives for runway safety area improvements to Runways 07/25 and 18/36. They are:
· Runway 07/25 - Alternative 2. This alternative would improve runway safety area on the primary, east-west runway by placing fill into marine waters east of Runway end 25. A 600-foot long RSA would be constructed that includes an EMAS (engineered materials arresting system) bed measuring 340 feet long by 170 feet. The EMAS would provide a 70-knot stopping capability for the B737-400, design aircraft.
· Runway 18/36 – Alternative 7. This alternative would improve runway safety areas on both ends of the north-south Runway 18/36. At the north, Runway end 18, no additional disturbance would occur beyond the current airport boundary but an EMAS bed measuring about 155 feet long by 170 feet wide, offering a 40-knot stopping capability for the B737-400 would be installed on the existing pavement. At the south, Runway end 36 the runway would be shifted about 240 feet further south, and a 360-foot RSA would be constructed for a combined 600 linear feet of new fill beyond the existing runway threshold.
The preferred alternatives and other build alternatives that will be evaluated in the Draft EIS are shown in the figure Kodiak RSA Alternatives Comparison on the EIS web site at http://www.kodiakairporteis.com/documents/Kodiak%20RSA%20Alternatives%20Comparison.pdf
Now that we have preferred alternatives we can move forward with some final work necessary to the environmental evaluations and compliance with other state and federal laws. For example, we recently met with USFWS and NOAA Fisheries to re-initiate consultation required by the Endangered Species Act. FAA will be submitting draft biological assessments to both of these agencies concurrent with publication of the Draft EIS. Similarly, concurrent with the Draft EIS ADOT&PF will be submitting to the U.S. Coast Guard and USFWS an application for an ANILCA Title X permit. The Draft EIS will serve as the requisite NEPA documentation supporting their application.
We still have much other work to be completed, including further consultation and coordination with many of you, but I fully expect the Draft EIS will be released to the public later this summer. As I mentioned in the last project update, FAA will provide 60 days for everyone to review the Draft EIS and submit comments, and at least one public hearing will be held in Kodiak during the review period.
I will keep you informed as we get closer to release of the Draft EIS. In the meantime, let me know if you have questions, comments or concerns. My phone number is 271-5453 or you can email Leslie.Grey@faa.gov.
Best regards, Leslie
Leslie A. Grey
Environmental Protection Specialist
FAA - Alaskan Region, Airports Division
907-271-5453
In keeping with our recent practice, I’m sending you this monthly update for the Kodiak Airport EIS. We skipped April because we had face-to-face meetings with some agencies. I much prefer those in-person conversations, but since we don’t have the time and budget to meet very often I’ll get back on schedule with our regular update.
As you are aware, it is typical although not required for federal agencies to identify a preferred alternative in draft NEPA analyses, for both environmental assessments and environmental impact statements. There are many reasons why identification of a preferred alternative can be helpful, to the agencies and public, but for projects involving complicated alternatives or sensitive environmental resources the preference isn’t always easy to determine. That is the case for proposed runway safety area improvements at Kodiak Airport. FAA and our consulting team needed to work through many challenging issues, including constraints on aviation operations at Kodiak. Further, we realized (with help from many of you) that the environmental analysis for some resources needed to be more rigorous.
I’m pleased to report that we are now in a position to identify what FAA intends to include in the Draft EIS as preferred alternatives for runway safety area improvements to Runways 07/25 and 18/36. They are:
· Runway 07/25 - Alternative 2. This alternative would improve runway safety area on the primary, east-west runway by placing fill into marine waters east of Runway end 25. A 600-foot long RSA would be constructed that includes an EMAS (engineered materials arresting system) bed measuring 340 feet long by 170 feet. The EMAS would provide a 70-knot stopping capability for the B737-400, design aircraft.
· Runway 18/36 – Alternative 7. This alternative would improve runway safety areas on both ends of the north-south Runway 18/36. At the north, Runway end 18, no additional disturbance would occur beyond the current airport boundary but an EMAS bed measuring about 155 feet long by 170 feet wide, offering a 40-knot stopping capability for the B737-400 would be installed on the existing pavement. At the south, Runway end 36 the runway would be shifted about 240 feet further south, and a 360-foot RSA would be constructed for a combined 600 linear feet of new fill beyond the existing runway threshold.
The preferred alternatives and other build alternatives that will be evaluated in the Draft EIS are shown in the figure Kodiak RSA Alternatives Comparison on the EIS web site at http://www.kodiakairporteis.com/documents/Kodiak%20RSA%20Alternatives%20Comparison.pdf
Now that we have preferred alternatives we can move forward with some final work necessary to the environmental evaluations and compliance with other state and federal laws. For example, we recently met with USFWS and NOAA Fisheries to re-initiate consultation required by the Endangered Species Act. FAA will be submitting draft biological assessments to both of these agencies concurrent with publication of the Draft EIS. Similarly, concurrent with the Draft EIS ADOT&PF will be submitting to the U.S. Coast Guard and USFWS an application for an ANILCA Title X permit. The Draft EIS will serve as the requisite NEPA documentation supporting their application.
We still have much other work to be completed, including further consultation and coordination with many of you, but I fully expect the Draft EIS will be released to the public later this summer. As I mentioned in the last project update, FAA will provide 60 days for everyone to review the Draft EIS and submit comments, and at least one public hearing will be held in Kodiak during the review period.
I will keep you informed as we get closer to release of the Draft EIS. In the meantime, let me know if you have questions, comments or concerns. My phone number is 271-5453 or you can email Leslie.Grey@faa.gov.
Best regards, Leslie
Leslie A. Grey
Environmental Protection Specialist
FAA - Alaskan Region, Airports Division
907-271-5453
Saturday, April 7, 2012
Kodiak Airport EIS Deadlines, etc Update 31 March 2012
We are fast approaching some important deadlines for the proposed runway safety area
improvements at Kodiak Airport EIS, the first of which will be publication of a draft
environmental impact statement (EIS). I’ll use this update to let you know our schedule for
the coming months and years. To put the schedule in context, I’ll start with a quick overview
of what goes into an EIS and our status within that process. The last paragraph refers to the
law necessitating our analysis of these proposed actions and the statutory commitment for
completing RSA improvements at Kodiak and other airports across the U.S.
The Steps of an EIS
I know that many of you are very familiar with the National Environmental Policy Act (NEPA)
and the procedures established by the Council on Environmental Quality (CEQ) to conform
with NEPA’s purpose, which essentially is to help public officials make informed decisions
with full understanding of possible environmental consequences. The process of meeting
that purpose also helps to make sure appropriate actions are taken to protect, restore, and
enhance the environment.
A mechanism outlined in the CEQ regulations to achieve those goals is preparation of an
EIS. Once a federal agency establishes that an EIS is needed, a notice of intent is published
announcing the decision and soliciting feedback from the public, agencies, tribes, and other
parties. This scoping process helps to define the range of actions, alternatives, and impacts
to be considered in the EIS. After the agency completes its analysis of potential
environmental impacts, the conclusions are published in a Draft EIS and another opportunity
for public is initiated. In a few relatively rare instances a draft is adopted as final, but in most
cases the federal agency will revise at least some aspect of the analysis and publish a Final
EIS that includes responses to comments made on the Draft. After a period of at least 30
days during which the Final EIS is available for public consideration, the federal agency can
make a decision concerning the actions that triggered the EIS. Our website for the project
includes a simple diagram of the main elements of an EIS and opportunities for public
involvement during that process (www.kodiakairporteis.com/schedule/schedule.htm).
Where is Kodiak Airport EIS in this Process?
On February 15, 2007, the Federal Aviation Administration (FAA) published a notice of intent
to prepare an EIS that would assess the impacts resulting from improvements to runway
safety areas (RSA) on two runways (18/36 and 7/25) at Kodiak Airport. During the ensuing
5+ years, FAA and our EIS Consultant Team have compiled information documenting
existing environmental conditions on and around the Airport; put together a range of
alternatives to improve RSAs on two of the Airport runways; and conducted analyses of
possible environmental, cultural, economic and social impacts. A preliminary draft EIS was
prepared and distributed late 2010 to Kodiak-area Tribes and state and federal agencies that
generated substantial discussion and valuable feedback concerning, in particular, the
alternatives being considered, methods of impact analysis, and some of our conclusions.
We’ve also begun to develop the documentation needed for compliance with a variety of
state and federal laws, in the event that a decision is reached to improve RSAs on one or
both of the runways. These efforts are driven in part by two factors. One, our schedule for
completion of the EIS and possible construction of the RSAs is very ambitious (see below).
Page 2 of 3
So we don’t have the luxury of waiting for an FAA decision to begin, for example, consultation
with National Marine Fisheries Service and U.S. Fish and Wildlife Service concerning
compliance with the Endangered Species Act. Second, FAA believes that consultation
processes are best done concurrent with NEPA analysis. Not only does this help integrate
NEPA with unique requirements of special purpose laws, but it results in more efficient and
streamlined government coordination and decision-making.
What is the Schedule for the Remainder of the EIS?
We are now working to complete a Draft EIS for public and agency review, and I hope to
release it in mid-summer of 2012. FAA will make it available at easily accessible locations in
Kodiak as well as at the FAA and Alaska Department of Transportation & Public Facilities
offices in Anchorage, and on the project website (www.kodiakairporteis.com). Hard copies
and CDs of the Draft EIS will be mailed to agency, tribal and other governmental contacts, as
well as those organizations and individuals who have expressed interest in receiving it.
In addition to opportunities to submit comments via mail and online, at least one public
hearing will also be conducted in Kodiak to receive additional verbal or written public
comments. I and members of my team will work hard to meet with as many people as we can
to explain the contents and conclusions in the Draft EIS, answer questions, and listen to
concerns. Summer can be a busy time for people in Kodiak, so we will extend our normal
public comment period to a full 60 days.
Once the public comment period is over we will begin preparing a Final EIS. Comments on
the Draft EIS can strongly influence the Final EIS and FAA’s ultimate decision concerning the
proposed RSA improvements, so we will carefully consider and respond to all of them. We’ll
make sure that substantive comments are attached to the Final EIS and posted on the project
website. FAA’s goal is to make decisions about RSA projects for Runways 18/36 and 7/25
no later than spring of next year.
What Happens After the Decision?
Construction of the proposed projects would take two to three years. If FAA were to approve
the RSA projects in early 2013 some components of the work could begin the same year, but
a number of factors would influence the construction start time. There are permits,
authorizations, consultations and other actions that would be needed before construction
could begin. Permits may include restrictions of various types that would dictate when
construction could occur and for how long. For instance, stipulations could be imposed to
protect natural resources, such as seasonal prohibitions to protect wildlife species of concern.
The construction work would also be designed to minimize impacts on commercial and
military aircraft operations.
Does the Schedule Above Have to be Met?
Yes! By passage of Public Law 109-115 Congress has directed that, not later than
December 31, 2015, the owner or operator of an airport such as Kodiak’s shall improve the
runway safety areas to comply with applicable FAA design standards. In other words, FAA
does not have the ability or authority to shift the deadline. Considering the approvals and
permits that could be needed, and the extended construction period that may be required to
Page 3 of 3
complete work on the runway ends, our efforts to complete the EIS and prepare and
complete a Record of Decision necessarily have to be aggressive.
I hope to be seeing some of you in the near future to talk more about the Draft EIS analysis,
and some of the consultation needs to comply with special purpose laws such as the
Endangered Species Act, Marine Mammal Protection Act, ANILCA and so forth. In the
meantime, let me know if you have questions, comments or concerns. My phone number is
271-5453 or you can email Leslie.Grey@faa.gov.
Regards,
Leslie Grey
Environmental Protection Specialist
FAA - Alaskan Region, Airports Division
907-271-5453
Friday, April 6, 2012
Kodiak Airport EIS Project Update Message – February 2012
Kodiak Airport EIS Project Update Message – February 2012
You’ll recall from the update I sent in January that a runway safety area (RSA) is an area
surrounding the runway that reduces the risk of damage to an aircraft if it deviates from the
runway. The size of a RSA typically depends on the largest and heaviest aircraft regularly
operating on that runway. Two of the runways at Kodiak Airport, 18/36 and 07/25, do not
meet RSA design standards for those aircraft. The traditional runway safety area consists of
graded areas at the runway ends and along the sides of the runway to offer aircraft protection
in the event of an overrun or veeroff during takeoff or landing. To meet the FAA’s
dimensional standards for RSAs at Kodiak Airport, sufficient fill would have to be placed at
the north (toward the Buskin River) and south (into Womens Bay) ends of Runway 18/36 and
the east end of Runway 7/25 (into Chiniak Bay) to create a graded surface that measures
500 feet wide by 1,000 feet long.
FAA is considering alternatives for Kodiak Airport that could lessen environmental impacts
caused by the fill and large disturbance areas associated with a conventional RSA
construction on the runway ends. One option is the use of Engineered Materials Arresting
System, or EMAS. The Preliminary Draft EIS distributed to agencies and tribes late in 2010
included one alternative incorporating EMAS. Engineering and operational analysis since
that time confirms that it may be a feasible technology for both runways, and I expect the
Draft EIS will consider alternatives incorporating EMAS on the north, south, and east runways
ends. I’ll use this update to provide some explanation of how EMAS works, where it has
been used, and some of the benefits and potential drawbacks of this technology.
What is EMAS?
A conventional runway safety area provides a substantial additional amount of land for an
aircraft to slow down and stop; for runways 18/36 and 7/25 at Kodiak Airport, the requirement
would be 1,000 feet beyond the runway ends. However, at many airports it may not be
practicable to build enough safety area at the runway ends to meet FAA standards. Existing
roads or railroads, natural features such as water bodies and large terrain changes, or
environmentally sensitive areas are among the reasons why it may not be prudent to
construct a conventional RSA. The FAA began conducting research in the 1990s to come up
with an alternative way to stop aircraft without requiring as much land as a conventional RSA.
Working in concert with the University of Dayton, the Port Authority of New York and New
Jersey, and the Engineered Arresting Systems Corporation (ESCO) of Logan Township, NJ,
a new technology, EMAS, emerged to safely arrest overrunning aircraft.
EMAS consists of a number of pre-cast, crushable, and energy-absorbing cellular cement
blocks installed at the end of a runway. The material in these blocks may be thought of as
something similar to pumice, a type of very light volcanic rock with lots of holes and
airspaces. An aircraft that hasn’t stopped by the runway end encounters “lead-in” blocks that
begin to crush under the movement and force of the wheels. The material in the EMAS is
designed to slow an aircraft by increasing the resistance, or friction, of the wheels as the
material gets crushed. The landing gear of the aircraft sinks into the “pumice-like” material
and the aircraft slows down as it gets further into the EMAS. How quickly the EMAS slows an
Page 2 of 4
aircraft is dependent on a number of factors including the weight of the aircraft and entry
speed, landing gear configuration, and even tire pressure.
Nice Theory, but does EMAS Really Work?
Currently, EMAS is installed at 63 runway ends at 42 airports in the United States, and on
five more runway ends at three airports outside the U.S. By the end of 2011, there had been
eight incidents where EMAS safely stopped overrunning aircraft carrying a total of 235 crew
and passengers, including incidents at JFK Airport in Queens, New York; Key West Airport in
Florida; and Downtown Greenville Airport, South Carolina. Obviously, EMAS can help
protect human health and safety, and it has worked with relatively little damage to the aircraft.
But it is also important to remember that EMAS really represents a component of runway
safety area that was used because of physical or environmental constraints unique to a
particular runway. A successful aircraft arrest by EMAS illustrates the value of FAA’s runway
safety area program, and there are many similar examples where conventional RSA has
provided the additional land needed for an aircraft carrying crew and passengers to come to
a complete stop, with little damage. If you are interested in more information about incidents
involving EMAS or locations where it has been installed, you might consider looking at FAAs
most recent fact sheet at
http://www.faa.gov/news/fact_sheets/news_story.cfm?newsId=12497.
Could EMAS be Used at Kodiak Airport?
FAA has determined that a properly designed EMAS will provide a level of overrun safety
generally equivalent to a standard runway safety area. And, as we know from the past 10+
years of experience, the technology works. Typically, FAA and Airport Sponsors (the owners
and operators of airports) consider installing EMAS on runway ends where space is limited
and a standard RSA is not feasible. EMAS may also deserve consideration in other
situations, even where standard runway safety area is considered practicable. For example,
because EMAS requires a smaller disturbance footprint than conventional RSA, its use could
lessen damage to sensitive environmental resources beyond runway ends. Some of these
reasons apply to Kodiak Airport.
A conventional RSA for Runways 18/36 and 7/25 would be 500 feet wide and extend 1,000
feet from the runway ends. To provide an equivalent level of safety at Kodiak Airport, an
EMAS would have to be capable of stopping a Boeing 737-400 (the “design” aircraft) that is
still traveling at a speed of 70-knots when it exits the runway. The EMAS required to achieve
this performance would be about 340 feet long and 170 feet wide. However, for runways like
Kodiak’s that have instrument approaches or visual guidance lighting, there must still be at
least 600 feet of RSA to protect aircraft landing short of the runway. To meet all of these
requirements, the final design would consist of 260 feet of conventional, graded RSA
immediately after the runway end, followed by 340 feet of EMAS for a total RSA length of 600
feet. Although the EMAS itself would only be about 170-feet wide (slightly wider than the
runway) it would be surrounded by traditional RSA out to the standard 500-foot width. The
net footprint for a RSA incorporating EMAS that meets FAA standards for the design aircraft
Page 3 of 4
would therefore be 600 feet long by 500 feet wide. (If that is all a little confusing, don’t worry,
we are developing figures for the Draft EIS that should be easy to follow!)
Other Important Considerations for Kodiak
Although EMAS may have appeal for some applications, it also has some potential
drawbacks. EMAS can be more expensive to construct and maintain than a traditional RSA.
Each EMAS is designed according to the specific needs of the airport and runway at which it
will be installed. The cellular concrete blocks, coatings, and other materials all have to be
shipped to the airport from the manufacturing facility in New Jersey. Further, EMAS will have
a limited design life (currently 10 to 20 years) and may have to be replaced, at another
substantial cost. Blocks that are damaged during routine airport functions or as a result of
aircraft arrest would need to be manufactured and replaced.
EMAS also has maintenance and care requirements that don’t apply to a conventional RSA.
For example, special equipment designed for use on EMAS is needed to drive on the
arresting bed, or to clear snow without fear of damaging individual blocks or system integrity.
A system of sealants, coatings, and outer layers protect the cellular concrete from
environmental conditions such as rain and ultraviolet radiation. Older versions of EMAS
needed periodic re-painting, although the manufacturer asserts that the improved plastic seal
coating for newer models should eliminate the need for painting and sealing.
An issue we have discussed with respect to Alaska airports concerns the practicality of using
EMAS in more challenging climates or environmental settings. Kodiak Airport exhibits some
of these factors including cold temperatures, frequent freeze/thaw cycles and a relatively wet
environment, especially at the runway ends exposed to waves and salt spray. In particular,
FAA Order 5200.9 acknowledges that local climate conditions consisting of “extreme cold
location with high flooding potential might limit the effectiveness and/or durability of an EMAS
installation.” Runways at Kodiak Airport, particularly runway end 25, can be exposed to high
waves that wash onto land. The strong energy behind wave action can carry rocks and other
materials that could damage the surface. A common concern for coastal airports has been
that salt water could have an especially corrosive effect on materials, coatings and sealants.
FAA and Airport Sponsors, among others, had also been uncertain as to how EMAS would
perform in locations with extremely cold temperatures, prompting research funding to the
Corps of Engineers Cold Regions Research and Engineering Laboratory to assess the
durability of EMAS in cold climates.
ESCO has responded to concerns about the resilience and durability of earlier EMAS
versions by developing the so-called 3rd generation product, known as “EMASMAX.”
According to the manufacturer, this version improves on earlier systems with better protection
against moisture penetration and jet blast protection, among other enhancements.
Regardless of specific climactic or environmental conditions, it is clear that frequent
inspection and regular maintenance are important factors to a viable, long-lasting EMAS.
(For the purpose of this update, “EMAS” refers to any version of the arresting system.)
Page 4 of 4
EMAS is currently being used at one location in Alaska, installed on Runway end 27 at
Cordova in 2007. As you know, Cordova has experienced a particularly difficult winter, with
heavy precipitation. At this time, we don’t know if or how the extreme weather and
tremendous snow loads have affected integrity of the Cordova EMAS. I know ADOT&PF, the
Cordova Airport “Sponsor”, is particularly keen to find out if there have been problems. I’ll let
you know when more information with this local-to-Alaska EMAS application becomes
available.
One interesting question, certainly applicable to Kodiak Airport and raised during our
meetings in November 2011, concerns the ability of EMAS to withstand a ground-shaking
event. Put another way, what magnitude of seismic event (i.e., earthquake) could an EMAS
handle – in terms of materials integrity, seam adhesion, sealant durability and so forth –
without requiring repair or replacement? I’m not aware of any testing has been conducted to
specifically answer this question. In practice, immediately following an earthquake a Sponsor
would quickly inspect all airport facilities to determine if they are in acceptable condition to
resume service. However, damage to an RSA, or an EMAS installed as part of the safety
area, should not prevent normal aviation operations from resuming, although it would then be
important to replace any damaged components of the EMAS as soon as possible after an
event.
In fact, this scenario is very much similar to the sequence of events after an aircraft overrun
into EMAS. An aircraft arrested in EMAS would be removed from the airfield as soon as
possible after immediate response activities have concluded; typically, this happens within a
couple of days or even hours after the accident. At that point, FAA will issue an official notice
to airman of the change in conditions at the airport, but service on the applicable runway
returns to normal relatively quickly.
Summary
EMAS represents a safety technology for aircraft overruns that can be comparable to
traditional, grade and fill runway safety area. The potential benefits of EMAS, particularly by
lessening adverse impacts on marine habitat and wildlife, have led FAA to conclude it should
be a component of some RSA alternatives to be evaluated in the EIS. We will work hard to
make sure the EIS provides a reasoned analysis of the benefits and drawbacks associated
with installation and care of an EMAS at Kodiak Airport.
Thanks so much for your interest in the project. I hope these updates are informative, but
don’t hesitate to let me know if you have questions, comments or concerns. My phone
number is 271-5453 or you can email Leslie.Grey@faa.gov.
Regards,
Leslie Grey
Environmental Protection Specialist
FAA - Alaskan Region, Airports Division
907-271-5453
Monday, January 30, 2012
30 January 2012: Runway Safety Areas Explanation
Hello Again!
In December I sent out an update that provided some answers to questions
raised during our November meetings, with a focus on the Kodiak Airport
runways: their dimensions and orientation, and how often they are used by
the different aircraft types, including commercial jets, turboprops, and
Coast Guard planes. This update builds on that earlier message by making
the connection between runway use – particularly the type of aircraft
regularly using a runway – and the applicable runway safety area (RSA)
standards. I will also compare the standard RSA dimensions with what
currently exists at Kodiak Airport.
What is a Runway Safety Area?
In the Advisory Circular Airport Design (#150-5300-13; 1989), FAA has
described the RSA as
“A defined surface surrounding the runway prepared or suitable for
reducing the risk of damage to airplanes in the event of an
undershoot, overshoot, or excursion from the runway.”
I’ll supplement that description a little. By “defined” we mean the RSA
has published dimensions of width, as measured from the runway centerline
to both sides, and length, or the distance of safety area beyond the runway
end. (We usually give these dimensions in feet). So, not only is there
RSA at the runway ends, designed to offer aircraft undershoot or overshoot
protection, but it also is found parallel to and along the sides of the
runway. This lateral safety area provides protection in case an aircraft
veers off during landing or takeoff. Our analysis of Kodiak Airport RSAs
tends to focus on the runway ends, but each of the alternatives for Runway
18/36 also includes improvement to lateral safety area on the east side of
the runway near the Runway 36 end. The attached, simple schematic from the
Airport Design Advisory Circular should help to illustrate the concept.
A way to establish that an RSA is “prepared or suitable for reducing the
risk of damage…” is by requiring it to be capable, under normal (dry)
conditions, of supporting aircraft that deviate from the runway without
causing structural damage to the aircraft or injury to its occupants. RSAs
make airports and flying safer, and reduce the potential for an aircraft to
be damaged if a landing or takeoff has problems. RSAs also make it easier
to get firefighting and rescue personnel and equipment to the scene of the
accident if an aircraft does deviate from the runway.
How are RSA Dimensions Determined?
The minimum size for a particular RSA (known as the Design Standard) can
vary depending on the type of aircraft expected to use the runway.
Generally speaking, the largest and heaviest aircraft regularly operating
on a runway dictates the RSA size. At Kodiak Airport this aircraft is the
Boeing 737-400, operated by Alaska Airlines. The Boeing 737-400 falls
within wingspan category Group III, which is based on primarily on an
aircraft’s wingspan and tail height, and approach category of C, a
classification based on an aircraft’s speed when approaching a runway for
landing. (In case you were wondering, all of the B737-series aircraft
using or potentially using Kodiak Airport, such as the B737-200 or newer
-700/800/900 series, fall within the same design categories and would
require the same RSA dimensions.)
What are the RSA Standards for Kodiak Airport Runways?
The RSA design standards for the Boeing 737-400 are
Q 600 feet of approach (i.e., undershoot) protection on each end,
Q 1,000 feet of overrun protection on each end, and
Q 250 feet of lateral protection on either side of the runway
centerline, for the length of the runway. This equates to a
500-foot wide lateral RSA.
Since most runways support arrivals and departures in each direction, the
600 feet of approach protection is incorporated in the 1,000 feet of
overrun protection. The net result, for a runway regularly serviced by the
B737-400, is a 500-foot wide rectangular area centered upon the runway and
extending 1,000 feet beyond each runway end.
The description above is for what we might term a “traditional” runway
safety area. Another option that requires a smaller footprint and still
complies with FAA’s design standards is to use Engineered Materials
Arresting System (EMAS). I’ll have more information on EMAS in another
project update.
While RSA design standards are based on the largest and heaviest aircraft
regularly operating on a runway, smaller aircraft use the Kodiak Airport
and do not require the same RSA areas. The Dash-8, flown by Era Aviation
several times a day into the airport, is also a group III category aircraft
based on wingspan, but it falls into approach category A because it has a
slower approach speed for landings. Accordingly, the RSA design standard
for the Dash 8 is smaller than for the 737 aircraft: 300 ft wide by 600
long. As I discussed in the last project update, both the Dash-8 and the
B737-400 regularly use Runways 07/25 and 18/36. However, the required RSA
dimensions for those runways are based upon the design standard for the
larger aircraft, the B737-400.
Why is FAA Considering Expansion of the Kodiak Airport RSAs?
Public Law 109-115 states that not later than December 31, 2015, the owner
or operator of an airport certificated under 49 U.S.C. 44706 (such as the
Kodiak Airport) shall improve the airport's runway safety areas to comply
with the FAA design standards required by 14 Code of Federal Regulations
Part 139. In other words, the RSAs at Kodiak Airport must meet the FAA’s
design standards, contained in FAA Advisory Circular 150/5300-13, by the
end of 2015. The following information describes the extent of RSA
shortcoming on the runways ends at Kodiak Airport.
Runway 07/25, the (almost) east-west runways
Q Runway 07 Landings on this runway are from the west and
departures are toward the east. Although the RSA undershoot
protection on Runway 7 meets FAA standards, the proximity of
Barometer Mountain precludes virtually any landings by larger
commercial aircraft. Overrun standards are not met as there is no
RSA on the east runway end.
Q Runway 25 This runway is the opposite of Runway 07; landings are
from the east and departures would be toward the west. There is
no RSA to provide undershoot protection for aircraft approaching
over the water from the east, nor is there RSA on the west runway
end to provide overrun protection.
Runway 18/36, the north-south runways
Q Runway 18 Aircraft approach this runway for landings from the
north, over the Buskin River estuary, and take off to the south.
There is no RSA on the north runway end to provide undershoot
protection, nor is there RSA on the south end of the runway,
toward the Coast Guard station, for overrun protection.
Q Runway 36 Since this runway is oriented 180 degrees from Runway
18, the directions of operation are reversed. Aircraft approach
Runway 36 from the south and depart to the north. As with Runway
18, there is no RSA on either runway end for overrun or undershoot
protection.
Runway 11/29 These runways accommodate operations from and to the
southeast, marine end of the runway or the northwest, interior of
Kodiak Island. The runway safety area in place around Runway 11/29 is
300 feet wide for the length of the runway and extends 600 feet
beyond the ends of the runway. This RSA meets the design standards
for smaller commercial and larger general aviation aircraft, and no
further improvement is required.
Summary
Federal law requires that RSAs at airports such as Kodiak comply with FAA
design standards. Further, the owner or operator of such airports –
ADOT&PF is the operator at Kodiak – must meet those standards not later
than December 31, 2015. Two of the runways at Kodiak Airport, 18/36 and
07/25, do not meet design standards for the largest aircraft regularly
using those runways. FAA has initiated an environmental impact statement
to evaluate the effects of improving those RSAs.
I hope this information is useful. Thanks again for continuing to stay
involved in this project. Please don’t hesitate to call (271-5453) or
write (Leslie.Grey@faa.gov) if you have questions, comments or concerns.
Regards, Leslie
(See attached file: RSA Schematic.pdf)
Leslie A. Grey
Environmental Protection Specialist
FAA - Alaskan Region, Airports Division
907-271-5453
Sunday, January 22, 2012
Kodiak Botanist Comments on FAA Rare Plant Survey Species Report
Stacy Studebaker, noted Kodiak botanist and author of Wildflowers and Other Plant Life of the Kodiak Archipelago, submitted the following comments to the FAA concerning the Rare Plant Survey Species Report. As you will read, the report has major problems.
Dear Leslie,
Thank you for sending me the Rare Plant Survey Species Report. I have read it over and have the following comments:
1) The first aerial photo on page 6 does not specify the location within the study area. Buskin River?
2) The photo of the sessile-leaf scurvy grass on page 4, figure 1, shows the plants mostly in fruit and not in flower even though it as labeled as being in flower.
3) The photo on page 5, figure 2 is labeled "sessile-leaf scurvy grass and oriental popcorn flower in Woman's Bay".
I don't see either species in this photo but instead, Spergularia canadensis (Canadian Scurvygrass) is poking up out of the shallow water.
This is a common intertidal species within the study area but it is not listed on the species list on Table 1, page 3.
4) Plagiobothrys is misspelled throughout the report as Plagiobothryus.
5) This report appears to have been quickly put together. Given the misidentified plants in the photo on page 5, the accuracy of their findings in Woman's Bay is questionable. Did they really find Cochlearia sessilifolia and Plagiobothrys orientalis there? There is no photo documentation of Plagiobothrys in the report to show that they actually found it or correctly identified it.
With this report, what kind of "management" decisions can be made? The authors really did not add anything to the information that Carolyn Parker and I already supplied. There is nothing in the report that says that these rare plants would or would not be impacted by the various alternatives in the PDEIS.
Sincerely,
Stacy Studebaker
Dear Leslie,
Thank you for sending me the Rare Plant Survey Species Report. I have read it over and have the following comments:
1) The first aerial photo on page 6 does not specify the location within the study area. Buskin River?
2) The photo of the sessile-leaf scurvy grass on page 4, figure 1, shows the plants mostly in fruit and not in flower even though it as labeled as being in flower.
3) The photo on page 5, figure 2 is labeled "sessile-leaf scurvy grass and oriental popcorn flower in Woman's Bay".
I don't see either species in this photo but instead, Spergularia canadensis (Canadian Scurvygrass) is poking up out of the shallow water.
This is a common intertidal species within the study area but it is not listed on the species list on Table 1, page 3.
4) Plagiobothrys is misspelled throughout the report as Plagiobothryus.
5) This report appears to have been quickly put together. Given the misidentified plants in the photo on page 5, the accuracy of their findings in Woman's Bay is questionable. Did they really find Cochlearia sessilifolia and Plagiobothrys orientalis there? There is no photo documentation of Plagiobothrys in the report to show that they actually found it or correctly identified it.
With this report, what kind of "management" decisions can be made? The authors really did not add anything to the information that Carolyn Parker and I already supplied. There is nothing in the report that says that these rare plants would or would not be impacted by the various alternatives in the PDEIS.
Sincerely,
Stacy Studebaker
Wednesday, January 18, 2012
UPDATE 18 January 2012
Hello, We have completed the Alaska Rare Plant Species Survey Report in support of the analysis being done for the Kodiak Airport Environmental Impact Statement. This work adds to previous findings concerning the presence of sensitive plant species in the Buskin River drainage just north of the airport. The report documents the results of the plant surveys conducted by FAA's consultants last August, not only in the Buskin River estuary, but also in estuarine habitats of drainages entering Women's Bay. The report has been posted on the project website at http://www.kodiakairporteis.com/documents/documents.htm. If you have any questions about the report or other aspects of the EIS, please don’t hesitate to e-mail or call me at 271-5453. Leslie Leslie A. Grey Environmental Protection Specialist FAA - Alaskan Region, Airports Division 907-271-5453
Wednesday, December 21, 2011
UPDATE: 21 December 2011
Happy Holidays!
Recent Kodiak Airport EIS project updates have been used to alert you to
meetings or let you know what progress has been made since previous
communications. I think we are now sufficiently advanced with our project
planning and alternatives development to start using these updates to
provide more in-depth information, especially concerning topics or issues
of widespread interest. We have plenty of material with which to work, but
don’t hesitate to let me know if you have suggestions for future updates.
FAA fielded a number of questions concerning runway use during our Runway
Safety Area EIS meetings in November. For example, while most people are
generally aware of the types of aircraft flying in and out of that airport,
especially the commercial aircraft, there was widespread interest in
learning which runways are the busiest and why. This project update should
answer some of those questions.
Let me start by reviewing runway characteristics and some of the key
factors influencing runway use at Kodiak Airport. I’ve attached a figure
that will help you to follow the different runway references.
As you know, Kodiak has three runways.
Runway 07/25 is the longest runway at 7,542 feet and is the most often
used, especially for commercial and military aircraft. This is the
runway used when landing from, or taking off to, the east.
Runway 18/36 is 5,013 feet long and used by both commercial and military
aircraft. Even though Runway 18/36 is shorter than Runway 11/29, the
north-south alignment and generally favorable terrain beyond the runway
ends allow it to be used by larger aircraft.
Runway 11/29 is 5,399 feet in total length and, because of the
mountainous terrain inland of this runway, is normally used only by
smaller general aviation aircraft. FAA is not considering expansion of
the Runway 11/29 Runway Safety Areas because they already meet standards
for the smaller general aviation aircraft that are the primary users of
that runway. Larger aircraft do use this runway, but not often enough
to warrant development of larger safety areas.
Runway length is certainly a factor in the process of deciding which runway
to use for an operation (i.e. a takeoff or landing), but not the only one.
Terrain is an important consideration relative to Kodiak Airport; for
example, Barometer Mountain limits approaches from, or departures to, the
west on Runway 07/25.
Aircraft characteristics are also a key factor in runway use. Generally
speaking, the larger (in terms of weight and wing-span) and faster (in
terms of landing or takeoff speeds) aircraft need more runway. Finally,
wind direction is a critical element of the decision-making process for
each operation. It is easier and safer for aircraft to land or takeoff
into the wind. Other considerations may include the types of navigational
aids for a particular runway, such as landing lights or approach slope
indicators, or the availability of special approach procedures.
So, knowing the runway lengths and something about the other elements that
influence operational decisions, what does the data tell us about runway
utilization at Kodiak Airport?
Air traffic control tower staff estimated that about half of the aircraft
activity takes place on Runway 07/25. Of the remaining operations, the
north-south Runway 18/36 gets slightly more use (~28% of operations) than
does the northwest-southeast trending Runway 11/29 (~22% of operations).
Again, though, these numbers reflect all fixed-wing aircraft, large or
small, and include military, commercial and general aviation (but not
helicopter operations).
It is equally instructive to consider runway use in terms of the types of
operation and the individual aircraft types. We’ve compiled information
supplied by Alaska Airlines, Era Aviation, and the Coast Guard concerning
the larger aircraft they fly into Kodiak:
· Alaska Airlines (Boeing 737-400 aircraft):
o 99% of takeoffs are conducted on Runway 07; 90% of landings are
conducted on Runway 25.
o 10% of landings are conducted on Runway 36; less than 1% of
operations take place on Runway 18, and Runway 11/29.
· Era Aviation (Dash-8 Turboprop aircraft):
o 80% of takeoffs are conducted on Runway 07; 75% of landings are
conducted on Runway 25.
o Approximately 17% of takeoffs and landings are conducted on
Runway 36; most of the remainder of their operations (about 5%)
is on Runway 18. Rarely, and primarily due to wind conditions,
the Dash-8 will use Runway 11/29.
· Coast Guard (C-130 cargo aircraft):
o Approximately 80% of annual operations take place on Runway
07/25.
o Runway 36 is used for about 15% of operations, and Runway 18
for another 5%.
The data for these three operators can’t be directly compared because of
differences in how each of them estimated runway usage for their own
aircraft. However, it is obvious that Runway 07/25 not only accommodates
about as many annual operations as the other two runways combined, but more
than ¾ of the “large” aircraft operations take place on it as well. Indeed,
because of its length and a “precision” instrument approach to Runway end
25 for landings from the east, Runway 07/25 is the most used runway at
Kodiak Airport. Runway 18/36 serves to accommodate aircraft operations
when the winds are not favorable for takeoffs or landings on Runway 07/25.
I hope this information helps explain the differences in runway use at
Kodiak Airport. We should have other opportunities to answer some of your
questions from the meetings in future updates. By the way, we’ve loaded
all the previous project updates from 2011 on the website at
www.kodiakairporteis.com/documents.
Again, thank you for continuing to stay involved in this project. Please
don’t hesitate to call (271-5453) or write (Leslie.Grey@faa.gov) if you
have questions, comments or concerns.
Regards,
Leslie Grey
Environmental Protection Specialist
FAA - Alaskan Region, Airports Division
907-271-5453
Thursday, November 10, 2011
UPDATE: Kodiak Airport Runway Extension Proposals 10 November 2011
This post contains the contents of two separate emails from Leslie Grey at the FAA. The first email was sent to all interested parties on the Kodiak Aiport Runway Extension Project email list; the second was sent to Stacy Studebaker in Kodiak in response to her query.
For more information on this project, go to the Kodiak Airport EIS site.
For more information on this project, go to the Kodiak Airport EIS site.
Hello, Last week we held meetings in Kodiak and Anchorage to present and explain the alternatives FAA will include in the Draft EIS. Thanks so much to many of you for attending. As usual, a lot of important issues were discussed and good questions asked. Before the end of the year I’ll send another update with information responding to some of those questions. In the meantime, I wanted to quickly respond to a couple of your needs. For those of you who like to keep track of interagency participation or want to follow up with others who attended, attached are the sign-in sheets from both meetings. I’ve also had the powerpoint presentation from these meetings posted on our project website at www.kodiakairporteis.com under the “documents” link on the left of the homepage. The presentation is the first document, titled “Project Alternatives Presentation – November 2011.” Those of you who attended in Kodiak may notice that we added two slides for the Anchorage meeting. These figures are helpful in comparing the features and disturbance areas of each alternative for Runway 07/25 (page 29 of the presentation) and Runway 18/36 (page 37). Again, thank you for continuing to stay involved in this project. Please don’t hesitate to call (271-5453) or write (Leslie.Grey@faa.gov) if you have questions, comments or concerns. Regards, Leslie Leslie A. Grey Environmental Protection Specialist FAA - Alaskan Region, Airports Division 907-271-5453
EMAIL TO STACY STUDEBAKER 10 NOVEMBER 2011:
Hello Stacy,
First of all, thank you for coming to the meeting last week, I appreciate
your interest and attendance. Regarding your request, as promised, we are
making last week's presentation available to all. We just posted the
meeting presentation which includes graphics of the alternatives as well as
the other information we discussed up on the project web site. You can
find it at www.kodiakairporteis.com under the documents link located on the
left side of the homepage. Shortly I'll be sending out a message to the
entire contact list to make sure everyone is aware of where they can get
the presentation.
Regarding the botany work completed recently, right now we are in the
process of compiling the data and documenting the results. I will make
arrangements for distribution of the findings either concurrent with the
Draft EIS or perhaps before hand, depending upon how quickly we can get all
of our review completed. I'll provide you with an update on this as soon
as I have a clearer picture of the timing. In the meantime, don't hesitate
at all to call or email me with any further questions. Leslie
Leslie A. Grey
Environmental Protection Specialist
FAA - Alaskan Region, Airports Division
Saturday, October 22, 2011
Kodiak Meeting for Airport EIS Details: Nov 1 2011
I’m really pleased so many of you will probably be able to attend our meetings to discuss runway safety area alternatives that will be evaluated in the Kodiak Airport EIS. We will have one interagency meeting in Kodiak and one in Anchorage, at the following locations and times:
Kodiak
- Date: Tuesday, November 1
- Time: 1:30 pm
- Place: Kodiak Harbor Convention Center, Katurwik Room
- Directions: Located at the corner of Rezanof Drive and Marine Way
Anchorage
- Date: Thursday, November 3
- Time: 9:00 am
- Place: Anchorage Federal Office Building Annex, Room B
- Directions: The Annex building entrance is located on 8th, across the street to the south from the main Federal building (the main Federal bldg is the big 5-story or so structure at 222 W. 7th Avenue). It looks like a building that is mostly underground. The security guard can direct you to conference room A.
I expect that each meeting will take no more than two hours. As I’ve mentioned before, please let me know if you would like us to meet separately with your organization concerning issues other than alternatives and we’ll work hard to accommodate your schedule.
Regards,
Leslie A. Grey
Environmental Protection Specialist
FAA - Alaskan Region, Airports Division
907-271-5453
Environmental Protection Specialist
FAA - Alaskan Region, Airports Division
907-271-5453
Monday, October 17, 2011
Kodiak Airport EIS meetings scheduled for Nov 1 & 2
Good afternoon,
Based on feedback from a number of our key agency representatives, I have
scheduled Kodiak Airport EIS meetings in Kodiak and Anchorage for the week
of October 31, 2011. The intent of these meetings will be to present
runway safety area alternatives that will be included in the Draft EIS.
FAA and members of the EIS consulting team will take this opportunity to
describe the alternatives, provide rationale for why some alternatives work
and others won’t, and explain the factors considered in developing a range
for full environment analysis. We are inviting agency and tribal
representatives, as well as other project stakeholders and interested
persons, to attend. Our schedule will be:
Kodiak Meetings
Tuesday Afternoon, November 1 – Alternatives Meeting for All
Wednesday Morning, November 2 – Available for individual
agency/tribal/stakeholder meetings
Anchorage Meetings
Thursday Morning, November 3 – Alternatives Meeting for All
Thursday Afternoon, November 3 - Available for individual
agency/tribal/stakeholder meetings
As you can see from the schedule, I have also set aside time to meet with
some of you who would like further consultation or to discuss other
elements of the EIS. I or another member of my consultant team will follow
up with you shortly to make those arrangements. Let me know if you or
others from your organization cannot attend the alternatives meeting, and I
will do my best to arrange a conference call or some other forum to cover
this information with you in the near future.
In the next few days we will reserve meetings rooms, and I will send
another announcement with locations and times. In the meantime, please
don’t hesitate to call me at 271-5453 if you have questions or specific
requests.
Leslie Grey
Environmental Protection Specialist
FAA - Alaskan Region, Airports Division
907-271-5453
Saturday, October 1, 2011
UPDATE: 30 September 2011 from Leslie Grey FAA
Good morning, I just wanted to give you a quick heads-up concerning progress on the Kodiak Airport EIS. FAA has completed our examination of the factors that may constrain or influence runway safety area design for the north-south (18/36) and east-west (07/25) runways at the airport. We’ll provide much more detail in the near future on how we conducted this review and analysis, but for now I’ll note that factors considered included: 1) operational requirements such as aircraft use and approach and departure procedures, 2) landing aids such as the Runway 36 VASI and the Runway 25 glide slope, 3) runway utilization patterns, 4) federal safety requirements for the design aircraft, and 5) opportunities to avoid or minimize environmental impacts. As a result of this effort, we’ve established a range of alternatives that will be subject to a full examination of environmental impacts in the EIS. Our consultants are at this time preparing materials that will depict the details of these new alternatives (and I emphasize “new,” because most of them were not included in the Preliminary Draft EIS). My plan is to schedule meetings with all of you sometime in November, in Kodiak and Anchorage, to present these new alternatives and explain the work behind our decisions. Due to continuing uncertainty over the 2012 budget for FAA’s Airports Program, unfortunately I can’t yet confirm that meetings will take place, let alone times and dates. But I hope to get approval sometime in the next week or so, and will then notify you all of the relevant details. In the meantime, please don’t hesitate to call (271-5453) or write (Leslie.Grey@faa.gov) if you have questions or comments or just want to talk about the EIS. Thanks very much, Leslie A. Grey Environmental Protection Specialist FAA - Alaskan Region, Airports Division 907-271-5453
Tuesday, August 23, 2011
23 August 2011 FAA Email Update from Leslie Grey
Hello, As you are probably aware, I and many of my co-workers in FAA’s Airports Division, in Alaska and nation-wide, were part of the approximately 4,000 workforce that was temporarily furloughed. The furlough affected a number of Alaska projects, including the Kodiak Airport EIS. The full impact of the work disruption on the EIS and other projects is hard to determine, but it certainly isn’t always limited to just a delay in schedule. Resources may get shifted to other priorities, contractors and consultants have to adapt their manpower allocations, contingency plans may have to be prepared to shut down work and, once a furlough is over, it takes extra time and energy to get back project momentum. The good news is, because their costs are allocated through a previously committed grant managed by Alaska Department of Transportation and Public Facilities (ADOT&PF), our consulting team had some funding to continue work while I was away from the office. However, even the consultant’s work had to be somewhat limited in scope, primarily because at the time of furlough FAA staff was pushing to complete our comprehensive re-examination of runway safety alternatives. The consultants can’t go very far with their efforts until FAA decides which alternatives will be carried through a detailed analysis of possible environmental impacts. Although we still haven’t completed our analysis, involving personnel from both Alaska Region and FAA headquarters with critical input from ADOT&PF, Alaska Airlines, and U.S. Coast Guard, I can report that the range of alternatives to be included in the Draft EIS will be substantially different than was initially presented in the Preliminary Draft EIS. More will be forthcoming on that subject in the near future. On a different note. You may remember that after we had distributed the Preliminary Draft EIS and received comments from reviewing agencies, Stacy Studebaker, a biologist and Kodiak resident, alerted us to the presence of a potentially rare plant in the vicinity of the Airport. The sessile-leaved scurvy grass (Cochlearia sessilifolia) was found in the Buskin River estuary in late summer 2010. The sessile-leaved scurvy grass is not a federally listed species, and there are no state protections for the species, but it is listed on the Alaska Rare Plant List by the Alaska Natural Heritage Program. The Heritage rank for Cochlearia sessilifolia ( G1G2Q/S1S2) means the species is considered either critically imperiled or imperiled at both a global and state geographic level. During our meetings earlier this year and in other communications, a number of you encouraged FAA to undertake a more thorough investigation for the presence and distribution of sessile-leaf scurvy grass in the area on or around the Kodiak Airport. The EIS consultants will be conducting surveys for this plant later in August, in the EIS project area as well as in surrounding suitable habitats within Chiniak Bay. Other potentially rare plant species may be found in the project area, such as the Oriental Popcornflower (Plagiobothrys orientalis) and the Alaska Mistmaiden ( Romazoffia unalaschkensis), and the surveys will document these and other species of interest that may be found. I hope this information is helpful. Please don’t hesitate to call (271-5453) or write (Leslie.Grey@faa.gov) if you have questions or comments or just want to talk about the EIS. Thanks very much, Leslie Grey Environmental Protection Specialist FAA - Alaskan Region, Airports Division 907-271-5453
Thursday, July 21, 2011
20 July 2011: Update from Leslie Grey, FAA
Hello, It’s been some time since I’ve provided all of you with information concerning the Kodiak Airport EIS. This message will give you a sense of the work we’ve been doing since our meetings in Anchorage and Kodiak last February. I’ll also take the opportunity to let you know of a new approach I’ve implemented to keep the public, tribes, agencies and other stakeholders informed of our efforts. First though, a summary of what is happening with the EIS. Most of our effort right now is being consumed by a comprehensive examination of possible alternatives. Last February I organized meetings with tribal and agency representatives during which we held some of the very good discussion concerning operational factors that can control or constrain what could be done with runways at Kodiak Airport. For example, a common question asked was whether the north-south Runway 18/36 could be shifted to the south, so that runway safety area could be installed on the south runway end without adding new land that would affect the Buskin River. We are conducting a rigorous evaluation of the aviation requirements for that runway to determine what, if any, degree of runway shift would be possible without bringing obstructions such as trees or terrain into the glide slopes for approaching aircraft. Other factors also have to be considered, such as impacts to critical navigational aids. So that all possible combinations of alternatives are being considered, a similar analysis is being conducted for the east-west Runway 7/25. We are also considering other questions and options raised during those meetings involving engineered materials arresting systems, side slope angles and other construction requirements. All of this analysis and re-examination of alternatives is taking more time than any of us working on the EIS would have liked, but I’m satisfied that the results will stand up to the very close scrutiny needed for such important decisions. In the meantime, I want to remind you that ADOT&PF is still planning to initiate construction work this summer on a project unrelated to the EIS or safety areas. A contractor has been hired to re-pave Runway 18/36, and at the same time replace lighting within and along that runway. Although much of the work will be on the surface, with little new disturbance, there will have to be some excavation along runway shoulders and for utility crossings. Once ADOT&PF establishes a work schedule we will make sure to pass that and other relevant information along. After the February meetings I promised to start sending periodic project updates, not only to keep you better informed of our work and progress, but also to provide responses to the more substantive questions and concerns. I’m sorry for the delay in getting that started – and I won’t bore you with details of the contracting issues we had to resolve or other seemingly minor bureaucratic issues to sort through – but this message serves notice that in the coming weeks and months, the updates will be regular and informative, even if the answers aren’t always what you would prefer to hear. I plan on using these communications to address a variety of topics, but particularly the areas that seem to generate the most interest among agency and tribal representatives, and the public. These updates will not always come directly from me. Certain senior members of my EIS consulting team, depending on their particular expertise and experience, will also be responsible for putting together the updates. I hope you will feel comfortable calling them directly or sending a reply e-mail if you have questions or concerns. Of course, please call or write me at any time, and if I can’t immediately provide the information you need I’ll make sure we get it to you as soon as possible. Thanks very much for your patience. On behalf of FAA, I truly appreciate your continued interest in the work we are doing and the necessary processes we must follow to reach a decision concerning proposed runway safety area improvements at Kodiak Airport. Leslie Grey Environmental Protection Specialist FAA - Alaskan Region, Airports Division 907-271-5453
http://kodiakairporteis.com/
Saturday, March 26, 2011
New Information on FAA Runway Extension Proposals (unconfirmed)
This information comes from an unconfirmed source:
New alternatives from the FAA. They have really scaled back on runway
18/36 to the North. They seem to favor new alternative 3. Extend
north end 450' with EMAS, extend south end 240' no EMAS. The new Alt 2
is extend north 240' w/ EMAS, extend south 600' no EMAS. Runway 7/25 is
now looking like: extend 600' to the east with 400' of EMAS.
New alternatives from the FAA. They have really scaled back on runway
18/36 to the North. They seem to favor new alternative 3. Extend
north end 450' with EMAS, extend south end 240' no EMAS. The new Alt 2
is extend north 240' w/ EMAS, extend south 600' no EMAS. Runway 7/25 is
now looking like: extend 600' to the east with 400' of EMAS.
Monday, March 14, 2011
FAA update 03 March 2011 Leslie Grey reaction to Kodiak meetings
I want to thank those of you who were able to participate in our recent
meetings concerning the Environmental Impact Statement (EIS) for Kodiak
Airport. As we mentioned in our discussions of runway safety area (RSA)
alternatives, FAA has put a lot of time and effort into exploring methods
for improving RSAs on two of the runways. I hope everyone who attended the
meetings would agree that there are significant limitations on what can be
done to improve RSAs without adversely affecting Airport operations and
service. Nevertheless, we heard some great questions and comments that
further emphasize the need for FAA to confirm our preliminary conclusions
and validate any assumptions used in developing a range of EIS
alternatives.
The comments, questions and criticisms generated at these meetings are not
only helpful, but always presented in a constructive manner, and I
personally appreciate the honest feedback. As I promised during the
meetings, we will work hard to address all of the issues you raised. In the
coming months, I expect to send you periodic project updates that will
provide responses to the more substantive questions and concerns.
Please don’t hesitate to call or write if you have questions about the
project. And, as always, please let me know if you should no longer be on
our e-mail distribution list, or if your contact information has changed.
If there are others in your organization who should receive these updates
and other information concerning the Kodiak Airport EIS, please forward
this message. Thanks! Leslie
Leslie A. Grey
Environmental Protection Specialist
FAA - Alaskan Region, Airports Division
907-271-5453
FAA update 08 Feb 2011 from Leslie Grey
I would like to update you on the status and progress of the Kodiak Airport Environmental Impact Statement (EIS) currently underway. The Federal Aviation Administration is preparing this EIS to evaluate actions proposed by the Airport Operator, the Alaska State Department of Transportation and Public Facilities (ADOT&PF), to improve the Runway Safety Area (RSA).
For those of you that may be unfamiliar, the RSA is a clear and graded area surrounding a runway. This area is there to minimize the severity of injury and aircraft damage in the event of an aircraft excursion. The project in Kodiak is to improve the deficient RSA to the extent practical.
First, I would like to thank you for your patience and continued interest throughout the course of this project. There has been a tremendous amount of work and progress since my last update in September 2010. Since that last message, we have evaluated and updated a range of build alternatives that support operational needs, are reasonable, and are financially feasible.
We are currently in the process of scheduling meetings in both Kodiak and Anchorage with staff from cooperating agencies, coordinating agencies, and federally recognized tribal governments. These meetings are a necessary part of the EIS process, and will assist us greatly in completing the Draft EIS in anticipation of a mid-summer 2010 release.
Our extended review comments and concerns generated from the preliminary draft EIS, as well as our development of updated build alternatives has impacted our schedule. Despite that impact, we still plan to release the Draft EIS as close to the above schedule of mid-summer 2010 as possible. As that date approaches, I will continue to provide updates letting you know were we are. If you have any questions or comments, please feel free to contact me at the number or e-mail address below.
Finally, if you no longer want updates, please let me know, and I will remove you from our mailing list. Additionally, if you know of someone that needs to be included, but is not, please forward this message, and have them contact me for inclusion in future updates.
Thank you so much, Leslie
Leslie A. Grey
Environmental Protection Specialist
FAA - Alaskan Region, Airports Division
907-271-5453
Environmental Protection Specialist
FAA - Alaskan Region, Airports Division
907-271-5453
Tuesday, January 11, 2011
FAA UPDATE: January 11, 2011
Subject: Kodiak Airport EIS Update Happy New Year! This message is to inform agencies and other interested parties of the status of the Kodiak Airport Environmental Impact Statement (EIS) being prepared by the Federal Aviation Administration (FAA). As you know, the purpose of the EIS is to evaluate actions proposed by the Airport operator, Alaska Department of Transportation and Public Facilities to bring the facility into compliance with the most current national aviation safety standards for runway safety areas. At the end of the summer I sent you a note to make you aware that FAA was conducting a comprehensive review of the runway safety area alternatives. That review has taken much longer than anticipated, but I am pleased to say it is nearing completion. I won't use e-mail to explain all of the changes we've made, or the policy rationale and operational constraints dictating the range of alternatives to be included in the Draft EIS. I plan on meeting with you in the near future to convey that information. However, I will tell you that the alternatives for both runways 18/36 and 7/25 will incorporate, to a much greater extent, the use of EMAS technology to provide added safety margin, particularly for aircraft overruns while landing or from an aborted takeoff. Greater reliance on EMAS should translate to somewhat smaller disturbance footprints in surrounding marine waters. (I realize that most of you don't practice arcane aviation acronyms on a frequent basis, so I'll just remind you that EMAS stands for Engineered Materials Arresting System, an array of crushable cellular cement blocks at the end of a runway that cause a rapid aircraft deceleration.) I will soon be directing my consulting team to start evaluating environmental impacts of the new alternatives, and to incorporate these analyses into a revised EIS. And, of course, we have made and are continuing to make other changes to the analyses based in many instances on the substantive comments made by those of you who reviewed the PDEIS. I will be scheduling meetings in mid-February, most likely the week of February 14 or February 21, to review our work with as many of you as are available. Our intent will be to present you with a detailed explanation of the alternatives, including the physical and operational factors that limit or even prevent consideration of some options and other rationale used to screen alternatives. I'll make sure that we spend as much time as needed to explain the new alternatives and why EMAS appears to provide Kodiak Airport with particular environmental advantages, as opposed to more traditional but larger RSA fill construction. I also hope to be able to present you with FAA's preferred alternatives. Our extended review of alternatives has affected the project schedule, but I still plan on releasing a Draft EIS to the public in mid-2011. As we get closer to completion of the analysis and documentation, I will provide additional updates to inform you of our progress and next steps. In the next couple of weeks I will send a follow-up message with specific dates and locations for our February meetings. In the meantime, please let me know if you have questions or concerns, at the contact information below. And, as always, please let me know if you should no longer be on our e-mail distribution list, or if your contact information has changed. If there are others in your organization who should receive these updates and other information concerning the Kodiak Airport EIS, please forward this message. Thanks! Leslie Leslie A. Grey Environmental Protection Specialist FAA - Alaskan Region, Airports Division 907-271-5453
Monday, September 13, 2010
FAA UPDATE: 13 September 2010
Leslie.Grey@faa.gov
Subject: Kodiak Airport EIS project update
All,
This message is to inform agencies and other interested parties of
the status of the Environmental Impact Statement (EIS) being prepared by
the Federal Aviation Administration (FAA). I think you are all aware
the purpose of the EIS is to evaluate actions proposed by the Airport
operator, Alaska Department of Transportation and Public Facilities
(ADOT&PF) to bring the facility into compliance with the most current
national aviation safety standards for runway safety areas.
First, I would like to thank many of you for attending our various
Anchorage and Kodiak meetings in late June. My consulting team and I found
them very informative, particularly as we were able to further explore
comments from agencies concerning the Preliminary Draft EIS (PDEIS), and
discuss some of our proposed changes to the document in response to your
concerns.
As I informed meeting participants earlier this summer, our efforts to
complete the Draft EIS (DEIS) are focused in two areas. At this time, FAA
is conducting a comprehensive review of the alternatives to affirm that the
EIS includes a suitable range of practicable and feasible runway safety
area enhancements for the runways in consideration. I can tell you the
Draft EIS will include some different alternatives than were evaluated in
the PDEIS. Second, we are thoroughly reviewing and, in some cases,
revising our impact analyses not only to consider the new alternatives but
to address substantive comments made by those of you who reviewed the
PDEIS. We are also working on all other aspects of the EIS to respond to
comments and assure an appropriate level of disclosure when the DEIS is
released for public review.
I plan to schedule another round of meetings in the near future with as
many of you as possible. Our intent will be to present you with a detailed
explanation of the alternatives, including the physical and operational
factors that limit or even prevent consideration of some options and other
rationale used to screen impracticable alternatives or those not feasible.
We will spend time reviewing the alternatives that are undergoing a full
environmental analysis, and I hope to be able at that time to present you
with FAA's preferred alternatives.
The current schedule for the project has the Draft EIS being released
during the first half of 2011. As we get closer to completion of the
analysis and documentation, I will provide additional updates to inform you
of our progress and next steps.
Let me know if you have questions or concerns, at the contact information
below. Additionally, the project website (kodiakairporteis.com) has
background information about the project.
P.S. Please let me know if you should no longer be on our e-mail
distribution list, or if your contact information has changed. In addition,
if there are others in your organization who should receive these updates
and other information concerning the Kodiak Airport EIS, please forward
this message. Thanks, Leslie
Leslie A. Grey
Environmental Protection Specialist
FAA - Alaskan Region, Airports Division
907-271-5453
Subscribe to:
Posts (Atom)















